Q.6. Describe the most important components of a project planning tool.

Ans:
One of the critical factors for project success is having a well-developed project plan. Here is a 10-step approach to creating the project plan, not only showing how it provides a roadmap for project managers to follow, but also exploring why it is the project manager's premier communications and control tool throughout the project. 

Step 1: Explain the project plan to key stakeholders and discuss its key components. One of the most misunderstood terms in project management, the project plan is a set of living documents that can be expected to change over the life of the project. Like a roadmap, it provides the direction for the project. And like the traveller, the project manager needs to set the course for the project, which in project management terms means creating the project plan. Just as a driver may encounter road construction or new routes to the final destination, the project manager may need to correct the project course as well.

A common misconception is that the plan equates to the project timeline, which is only one of the many components of the plan. The project plan is the major work product from the entire planning process, so it contains all the planning documents for the project.

Typically many of the project's key stakeholders, that is those affected by both the project and the project's end result, do not fully understand the nature of the project plan. Since one of the most important and difficult aspects of project management is getting commitment and buying, the first step is to explain the planning process and the project plan to all key stakeholders. It is essential for them to understand the importance of this set of documents and to be familiar with its content, since they will be asked to review and approve the documents that pertain to them.


Components of the Project Plan Include
Baselines. Baselines are sometimes called performance measures, because the performance of the entire project is measured against them. They are the project's three approved starting points and include the scope, schedule, and cost baselines. These provide the 'stakes in the ground.' That is, they are used to determine whether or not the project is on track, during the execution of the project.

Baseline management plans. These plans include documentation on how variances to the baselines will be handled throughout the project. Each project baseline will need to be reviewed and managed. A result of this process may include the need to do additional planning, with the possibility that the baseline(s) will change. Project management plans document what the project team will do when variances to the baselines occur, including what process will be followed, who will be notified, how the changes will be funded, etc.

Other work products from the planning process. These include a risk management plan, a quality plan, a procurement plan, a staffing plan, and a communications plan.


Step 2: Define roles and responsibilities. Not all key stakeholders will review all documents, so it is necessary to determine who on the project needs to approve which parts of the plan. Some of the key players are:
  • Project sponsor, who owns and funds the entire project. Sponsors need to review and approve all aspects of the plan. 
  • Designated business experts, who will define their requirements for the end product. They need to help develop the scope baseline and approve the documents relating to scope. They will be quite interested in the timeline as well. 
  • Project manager, who creates, executes, and controls the project plan. Since project managers build the plan, they do not need to approve it.
  • Project team, who build the end product. The team needs to participate in the development of many aspects of the plan, such as identifying risks, quality, and design issues, but the team does not usually approve it.
  • End users, who use the end product. They too, need to participate in the development of the plan, and review the plan, but rarely do they actually need to sign off. 
  • Others, such as auditors, quality and risk analysts, procurement specialists, and so on may also participate on the project. They may need to approve the parts that pertain to them, such as the Quality or Procurement plan.


Step 3: Hold a kickoff meeting. The kickoff meeting is an effective way to bring stakeholders together to discuss the project. It is an effective way to initiate the planning process. It can be used to start building trust among the team members and ensure that everyone's idea are taken into account. Kickoff meetings also demonstrate commitment from the sponsor for the project. Here are some of the topics that might be included in a kickoff meeting:
  • Business vision and strategy (from sponsor) 
  • Project vision (from sponsor) 
  • Roles and responsibilities 
  • Team building 
  • Team commitments 
  • How team makes decisions 
  • Ground rules 
  • How large the group should be and whether sub-groups are necessary


Step 4: Develop a Scope Statement. The Scope Statement is arguably the most important document in the project plan. It's the foundation for the rest of the project. It describes the project and is used to get common agreement among the stakeholders about the scope. The Scope Statement clearly describes what the outcome of the project will be. It is the basis for getting the buy-in and agreement from the sponsor and other stakeholders and decreases the chances of miscommunication. This document will most likely grow and change with the life of the project. The Scope Statement should include:
  • Business need and business problem 
  • Project objectives, stating what will occur within the project to solve the business problem 
  • Benefits of completing the project, as well as the project justification 
  • Project scope, stated as which deliverables will be included and excluded from the project. 
  • Key milestones, the approach, and other components as dictated by the size and nature of the project. 
It can be treated like a contract between the project manager and sponsor, one that can only be changed with sponsor approval.


Step 5: Develop scope baseline. Once the deliverables are confirmed in the Scope Statement, they need to be developed into a work breakdown structure (WBS), which is a decomposition of all the deliverables in the project. This deliverable WBS forms the scope baseline and has these elements:
  • Identifies all the deliverables produced on the project, and therefore, identifies all the work to be done. 
  • Takes large deliverables and breaks them into a hierarchy of smaller deliverables. That is, each deliverable starts at a high level and is broken into subsequently lower and lower levels of detail. 
  • The lowest level is called a "work package" and can be numbered to correspond to activities and tasks. 
The WBS is often thought of as a task breakdown, but activities and tasks are a separate breakdown, identified in the next step.


Step 6: Develop the schedule and cost baselines. Here are the steps involved in developing the schedule and cost baselines.
    1. Identify activities and tasks needed to produce each of the work packages, creating a WBS of tasks. 
    2. Identify resources for each task, if known. 
    3. Estimate how long it will take to complete each task. 
    4. Estimate cost of each task, using an average hourly rate for each resource. 
    5. Consider resource constraints, or how much time each resource can realistically devoted to this project. 
    6. Determine which tasks are dependent on other tasks, and develop critical path. 
    7. Develop schedule, which is a calendarization of all the tasks and estimates. It shows by chosen time period (week, month, quarter, or year) which resource is doing which tasks, how much time they are expected to spend on each task, and when each task is scheduled to begin and end. 
    8. Develop the cost baseline, which is a time-phased budget, or cost by time period. 
This process is not a one-time effort. Throughout the project you will most likely be adding to repeating some or all of these steps.


Step 7: Create baseline management plans. Once the scope, schedule, and cost baselines have been established, you can create the steps the team will take to manage variances to these plans. All these management plans usually include a review and approval process for modifying the baselines. Different approval levels are usually needed for different types of changes. In addition, not all new requests will result in changes to the scope, schedule, or budget, but a process is needed to study all new requests to determine their impact to the project.


Step 8: Develop the staffing plan. The staffing plan is a chart that shows the time periods, usually month, quarter, year, that each resource will come onto and leave the project. It is similar to other project management charts, like a Gantt chart, but does not show tasks, estimates, begin and end dates, or the critical path. It shows only the time period and resource and the length of time that resource is expected to remain on the project.


Step 9: Analyze project quality and risks.
Project Quality: Project quality consists of ensuring that the end product not only meets the customer specifications, but is one that the sponsor and key business experts actually want to use. The emphasis on project quality is on preventing errors, rather than inspecting the product at the end of the project and then eliminating errors. Project quality also recognizes that quality is a management responsibility and needs to be performed throughout the project.

Creating the Quality Plan involves setting the standards, acceptance criteria, and metrics that will be used throughout the project. The plan, then, becomes the foundation for all the quality reviews and an inspection performed during the project, and is thus used throughout project execution.

Project Risks: A risk is an event that may or may not happen, but could have a significant effect on the outcome of a project, if it were to occur. For example, there may be a 50% chance of a significant change in sponsorship in the next few months. Analyzing risks includes making a determination of both the probability that a specific event may occur and if it does, assessing its impact. The quantification of both the probability and impact will lead to determining which are the highest risk that needs attention. Risk management includes not just assessing the risk, but developing risk management plans to understand and communicate how the team will respond to the high-risk events.


Step 10: Communicate! One important aspect of the project plan is the Communications Plan. This document states such things as:
  • Who on the project wants which reports, how often, in what format, and using what media. 
  • How issues will be escalated and when. 
  • Where project information will be stored and who can access it. 
For complex projects, a formal communications matrix is a tool that can help determine some of the above criteria. It helps document the project team's agreed-on method for communicating various aspects of the project, such as routine status, problem resolution, decisions, etc. 

Once the project plan is complete, it is important not just to communicate the importance of the project plan to the sponsor, but also to communicate its contents once it's created. This communication should include such things as:
  • Review and approval of the project plan. 
  • Process for changing the contents of the plan. 
  • Next steps—executing and controlling the project plan and key stakeholder roles/responsibilities in the upcoming phases.

No comments:

Post a Comment

Labels

1st Sem (common) Subjects (150) 1st Sem BBA (10) 2nd Sem (common) Subjects (70) 2nd Sem BBA (10) 3rd Sem Banking Management (30) 3rd Sem BBA (8) 3rd Sem core/common subjects (37) 3rd Sem Environmental Management (2) 3rd Sem Event Management (8) 3rd Sem Finance Management (113) 3rd Sem HEALTH SERVICE MANAGEMENT (HSM/HCS) (65) 3rd Sem Human Resource Management (98) 3rd Sem Information Systems Management (8) 3rd Sem International Business (34) 3rd Sem Marketing Management (129) 3rd Sem Operations Management (8) 3rd Sem Project Management (103) 3rd Sem Retail Operations Management (8) 3rd Sem Supply Chain Management (SCM) (16) 3rd Sem Total Quality Management (TQM) (16) 4th Sem Banking Management (38) 4th Sem core/common subjects (65) 4th Sem Event Management (8) 4th Sem Finance Management (8) 4th Sem HEALTH SERVICE MANAGEMENT (HSM/HCS) (21) 4th Sem Human Resource Management (104) 4th Sem Information Systems Management (8) 4th Sem International Business (12) 4th Sem Marketing Management (8) 4th Sem Operations Management (37) 4th Sem Project Management (56) 4th Sem Retail Operations Management (8) 4th Sem Supply Chain Management (SCM) (8) 4th Sem Total Quality Management (TQM) (8) BBA101 - Communication Skills (2) BBA101 Set1 (1) BBA101 Set2 (1) BBA102 - Organization Behaviour (2) BBA102 Set1 (1) BBA102 Set2 (1) BBA103 - Business Environment (2) BBA103 Set1 (1) BBA103 Set2 (1) BBA104 - Quantitative Techniques in Business (2) BBA104 Set1 (1) BBA104 Set2 (1) BBA105 - Computer Fundamentals (2) BBA105 Set1 (1) BBA105 Set2 (1) BBA201 - Research Methods (2) BBA201 Set1 (1) BBA201 Set2 (1) BBA202 - Business Strategy (2) BBA202 Set1 (1) BBA202 Set2 (1) BBA203 - Financial Accounting (2) BBA203 Set1 (1) BBA203 Set2 (1) BBA204 - Marketing Management (2) BBA204 Set1 (1) BBA204 Set2 (1) BBA205 - Management Information Systems (2) BBA205 Set1 (1) BBA205 Set2 (1) BBA301 - Legal and Regulatory Framework (2) BBA301 Set1 (1) BBA301 Set2 (1) BBA302 - Human Resource Management (2) BBA302 Set1 (1) BBA302 Set2 (1) BBA303 - Quality Management (2) BBA303 Set1 (1) BBA303 Set2 (1) BBA304 - Advertising and sales (2) BBA304 Set1 (1) BBA304 Set2 (1) Differences between Managers and Leaders (1) EM0001 - Fundamentals of Environment (2) EM0001 Set1 (1) EM0001 Set2 (1) ET0001 - Human resource management for events (2) ET0001 Set1 (1) ET0001 Set2 (1) ET0002 - Corporate Event Project Management (2) ET0002 Set1 (1) ET0002 Set2 (1) ET0003 - Event marketing and management (2) ET0003 Set1 (1) ET0003 Set2 (1) ET0004 - Event Finance Management (2) ET0004 Set1 (1) ET0004 Set2 (1) ET0006 - Event Risk Management (2) ET0006 Set1 (1) ET0006 Set2 (1) ET0007 - Entrepreneurship (2) ET0007 Set1 (1) ET0007 Set2 (1) ET0008 - Special Events (2) ET0008 Set1 (1) ET0008 Set2 (1) ET0009 - Event Management for Tourism (2) ET0009 Set1 (1) ET0009 Set2 (1) IB0010 - International Financial Management (9) IB0010 Set1 (7) IB0010 Set2 (2) IB0011 - International Marketing (9) IB0011 Set1 (2) IB0011 Set2 (7) IB0012 - Management of Multinational Corporations (8) IB0012 Set1 (7) IB0012 Set2 (1) IB0013 - Export-Import Management (8) IB0013 Set1 (7) IB0013 Set2 (1) IB0015 - Foreign Trade of India (6) IB0015 Set1 (3) IB0015 Set2 (3) IB0016 - International Logistics and Distribution Management (2) IB0016 Set1 (1) IB0016 Set2 (1) IB0017 - International Business Environment and International Law (2) IB0017 Set1 (1) IB0017 Set2 (1) IB0018 - Export Import Finance (2) IB0018 Set1 (1) IB0018 Set2 (1) MA0036 - Financial Systems and Commercial Banking (14) MA0036 Set1 (7) MA0036 Set2 (7) MA0037 - Banking Related Laws and Practices (12) MA0037 Set1 (6) MA0037 Set2 (6) MA0038 - Banking Operations (2) MA0038 Set1 (1) MA0038 Set2 (1) MA0039 - Retail Banking (2) MA0039 Set1 (1) MA0039 Set2 (1) MA0040 (1) MA0041 - Merchant Banking and Financial Services (5) MA0041 Set1 (3) MA0041 Set2 (2) MA0042 - Treasury Management (14) MA0042 Set1 (7) MA0042 Set2 (7) MA0043 - Corporate Banking (9) MA0043 Set1 (5) MA0043 Set2 (4) MA0044 - Institutional Banking (10) MA0044 Set1 (8) MA0044 Set2 (2) MB0038 - Management Process and Organization Behavior (24) MB0038 Set1 (16) MB0038 Set2 (9) MB0039 - Business Communication (24) MB0039 Set1 (15) MB0039 Set2 (9) MB0040 - STATISTICS FOR MANAGEMENT (24) MB0040 Set1 (15) MB0040 Set2 (9) MB0041 - Financial Management and Accounting (24) MB0041 Set1 (15) MB0041 Set2 (9) MB0042 - Managerial Economics (30) MB0042 Set1 (15) MB0042 Set2 (15) MB0043 - Human Resource Management (24) MB0043 Set1 (15) MB0043 Set2 (9) MB0044 - PRODUCTION and OPERATIONS MANAGEMENT (16) MB0044 Set1 (8) MB0044 Set2 (8) MB0045 - Financial Management (9) MB0045 Set1 (7) MB0045 Set2 (2) MB0046 - Marketing Management (10) MB0046 Set1 (8) MB0046 Set2 (2) MB0047 - MANAGEMENT INFORMATION SYSTEMS (15) MB0047 Set1 (8) MB0047 Set2 (7) MB0048 - OPERATIONS RESEARCH (10) MB0048 Set1 (8) MB0048 Set2 (2) MB0049 - Project Management (10) MB0049 Set1 (8) MB0049 Set2 (2) MB0050 - Research Methodology (20) MB0050 Set1 (10) MB0050 Set2 (10) MB0051 - Legal Aspects of Business (17) MB0051 Set1 (13) MB0051 Set2 (4) MB0052 - Strategic Management and Business Policy (30) MB0052 Set1 (15) MB0052 Set2 (15) MB0053 - International Business Management (35) MB0053 Set1 (19) MB0053 Set2 (16) MF0010 - Security Analysis and Portfolio Management (39) MF0010 Set1 (21) MF0010 Set2 (18) MF0011 - Mergers and Acquisitions (24) MF0011 Set1 (14) MF0011 Set2 (10) MF0012 - Taxation Management (25) MF0012 Set1 (16) MF0012 Set2 (9) MF0013 - Internal Audit and Control (25) MF0013 Set1 (16) MF0013 Set2 (9) MF0014 (1) MF0015 - International Financial Management (2) MF0015 Set1 (1) MF0015 Set2 (1) MF0016 - Treasury Management (2) MF0016 Set1 (1) MF0016 Set2 (1) MF0017 - Merchant Banking and Financial Services (2) MF0017 Set1 (1) MF0017 Set2 (1) MF0018 - Insurance and Risk Management (2) MF0018 Set1 (1) MF0018 Set2 (1) MH0051 - Health Administration (15) MH0051 Set1 (5) MH0051 Set2 (10) MH0052 - Hospital Organisation Operations and Planning (26) MH0052 Set1 (12) MH0052 Set2 (14) MH0053 - Hospital and Healthcare Information Management (11) MH0053 Set1 (3) MH0053 Set2 (8) MH0054 - Finance Economics and Planning in HCS (13) MH0054 Set1 (10) MH0054 Set2 (3) MH0055 (1) MH0056 - Public Relations and Marketing for Healthcare Organisation (6) MH0056 Set1 (3) MH0056 Set2 (3) MH0057 - Management of Healthcare Human Resources (5) MH0057 Set1 (2) MH0057 Set2 (3) MH0058 - Legal Aspects in Healthcare Administration (5) MH0058 Set1 (3) MH0058 Set2 (2) MH0059 - Quality Management in HCS (5) MH0059 Set1 (3) MH0059 Set2 (2) MI0014 (1) MI0033 - Software Engineering (2) MI0033 Set1 (1) MI0033 Set2 (1) MI0034 - Database Management System (2) MI0034 Set1 (1) MI0034 Set2 (1) MI0035 - Computer Network (2) MI0035 Set1 (1) MI0035 Set2 (1) MI0036 - BUSINESS INTELLIGENCE TOOLS (2) MI0036 Set1 (1) MI0036 Set2 (1) MI0038 - Enterprise Resource Planning (2) MI0038 Set1 (1) MI0038 Set2 (1) MI0039 - eCommerce (2) MI0039 Set1 (1) MI0039 Set2 (1) MI0040 - Technology Management (2) MI0040 Set1 (1) MI0040 Set2 (1) MI0041 - Java and Web Design (2) MI0041 Set1 (1) MI0041 Set2 (1) MK0010 - Sales Distribution and Supply Chain Management (33) MK0010 Set1 (17) MK0010 Set2 (16) MK0011 - Consumer Behaviour (31) MK0011 Set1 (16) MK0011 Set2 (15) MK0012 - Retail Marketing (42) MK0012 Set1 (20) MK0012 Set2 (22) MK0013 - Market Research (23) MK0013 Set1 (12) MK0013 Set2 (11) MK0014 (1) MK0015 - Service Marketing And Customer Relationship Management (2) MK0015 Set1 (1) MK0015 Set2 (1) MK0016 - Advertising Management and Sales Promotion (2) MK0016 Set1 (1) MK0016 Set2 (1) MK0017 - eMarketing (2) MK0017 Set1 (1) MK0017 Set2 (1) MK0018 - International Marketing (2) MK0018 Set1 (1) MK0018 Set2 (1) ML0010 - Warehousing and Supply Chain Management (2) ML0010 Set1 (1) ML0010 Set2 (1) ML0011 - Buying and Merchandising (2) ML0011 Set1 (1) ML0011 Set2 (1) ML0012 - Store Operations (2) ML0012 Set1 (1) ML0012 Set2 (1) ML0013 - Retail IT Management (2) ML0013 Set1 (1) ML0013 Set2 (1) ML0014 (1) ML0015 - Services Marketing and Customer Relationship Management (2) ML0015 Set1 (1) ML0015 Set2 (1) ML0016 - Advertising Management and Sales Promotion (2) ML0016 Set1 (1) ML0016 Set2 (1) ML0017 - Mall Management (2) ML0017 Set1 (1) ML0017 Set2 (1) ML0018 - Project Management in Retail (2) ML0018 Set1 (1) ML0018 Set2 (1) MU0010 - Manpower Planning and Resourcing (31) MU0010 Set1 (16) MU0010 Set2 (15) MU0011 - Management and Organizational Development (20) MU0011 Set1 (10) MU0011 Set2 (10) MU0012 - Employee Relations Management (22) MU0012 Set1 (11) MU0012 Set2 (11) MU0013 - Human Resource Audit (25) MU0013 Set1 (15) MU0013 Set2 (10) MU0014 (1) MU0015 - Compensation Benefits (24) MU0015 Set1 (14) MU0015 Set2 (10) MU0016 - Performance Management and Appraisal (27) MU0016 Set1 (12) MU0016 Set2 (15) MU0017 - Talent Management and Employee Retention (24) MU0017 Set1 (12) MU0017 Set2 (12) MU0018 - Change Management (29) MU0018 Set1 (9) MU0018 Set2 (20) OM0010 - Operations Management (2) OM0010 Set1 (1) OM0010 Set2 (1) OM0011 - Enterprise Resource Planning (2) OM0011 Set1 (1) OM0011 Set2 (1) OM0012 - Supply Chain Management (2) OM0012 Set1 (1) OM0012 Set2 (1) OM0013 - Advanced Production and Operations Management (2) OM0013 Set1 (1) OM0013 Set2 (1) OM0014 (1) OM0015 - Maintenance Management (6) OM0015 Set1 (3) OM0015 Set2 (3) OM0016 - Quality Management (11) OM0016 Set1 (8) OM0016 Set2 (3) OM0017 - Advanced Production and Planning Control (11) OM0017 Set1 (3) OM0017 Set2 (8) OM0018 - Technology Management (9) OM0018 Set1 (7) OM0018 Set2 (2) PM0010 - Introduction to Project Management (26) PM0010 Set1 (14) PM0010 Set2 (12) PM0011 - Project Planning and Scheduling (25) PM0011 Set1 (14) PM0011 Set2 (11) PM0012 - Project Financing and Budgeting (26) PM0012 Set1 (14) PM0012 Set2 (12) PM0013 - Managing Human Resources in Projects (26) PM0013 Set1 (13) PM0013 Set2 (14) PM0014 (1) PM0015 - Quantitative Methods in Project Management (14) PM0015 Set1 (8) PM0015 Set2 (6) PM0016 - Project Risk Management (14) PM0016 Set1 (7) PM0016 Set2 (7) PM0017 - Project Quality Management (14) PM0017 Set1 (7) PM0017 Set2 (7) PM0018 - Contracts Management in Projects (14) PM0018 Set1 (7) PM0018 Set2 (7) Project (1) QM0010 - Foundations of Quality Management (4) QM0010 Set1 (2) QM0010 Set2 (2) QM0011 - Principles and Philosophies of Quality Management (4) QM0011 Set1 (2) QM0011 Set2 (2) QM0012 - Statistical Process Control and Process Capability (4) QM0012 Set1 (2) QM0012 Set2 (2) QM0013 - Quality Management Tools (4) QM0013 Set1 (2) QM0013 Set2 (2) QM0014 (1) QM0015 - ISO/QS 9000 Elements (2) QM0015 Set1 (1) QM0015 Set2 (1) QM0016 - Managing Quality in the Organization (2) QM0016 Set1 (1) QM0016 Set2 (1) QM0017 - Quality Management System (2) QM0017 Set1 (1) QM0017 Set2 (1) QM0018 - Quality Development Methods (2) QM0018 Set1 (1) QM0018 Set2 (1) SC0001 - Supply Chain Management (4) SC0001 Set1 (2) SC0001 Set2 (2) SC0002 - Outsourcing (4) SC0002 Set1 (2) SC0002 Set2 (2) SC0003 - Food Supply Chain Management (4) SC0003 Set1 (2) SC0003 Set2 (2) SC0004 - Inventory Management (4) SC0004 Set1 (2) SC0004 Set2 (2) SC0006 - Global Logistics and Supply Chain Management (2) SC0006 Set1 (1) SC0006 Set2 (1) SC0007 - Category Management in Purchasing (2) SC0007 Set1 (1) SC0007 Set2 (1) SC0008 - Purchasing and Contracting for Projects (2) SC0008 Set1 (1) SC0008 Set2 (1) SC0009 - Supply Chain Cost Management (2) SC0009 Set1 (1) SC0009 Set2 (1) SMU BBA Subjects (1) SMU MBA/PGDBA Subjects (1)